Matters ▸ Order
File 24-0662
That the Director of Engineering assess the timing of the traffic light at Main Street and Broadway and consider lengthening the cycle time.
That the Director of Engineering assess the timing of the traffic light at Main Street and Broadway and consider lengthening the cycle time.