Matters ▸ Order
File 25-0071
That the Commissioner of Public Works and the Director of Engineering report to this Council on the failure of the boiler at the Brown School and the short- and long-term plans to address heating for the building.
That the Commissioner of Public Works and the Director of Engineering report to this Council on the failure of the boiler at the Brown School and the short- and long-term plans to address heating for the building.